Back
RESTORATION
100% confidence
via regex
GAZETTE NOTICE NO. 5413
GAZETTE NOTICE NO. 5413
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
RESTORATION
PURSUANT to regulation 21 of the Environmental Management
and Co-ordination (Impact Assessment and Audit) Regulations, 2003,
the National Environment Management Authority (NEMA) has
received an Environmental Impact Assessment Study Report for the
above proposed project.
The project proponent intends to install submarine fiber optic
system that connects the Kenya to Pakistan, Djibouti and Europe via
the fibre optic cable whose entry point is at Nyali Beach in Mombasa.
The project will consist of marine component and terrestrial
component. The marine component entails installation of a submarine
cable for distance totaling to 498.973km and the total cable length is
511.721km, the cable is expected to traverse along the marine reserve
which is within the jurisdiction of the Kenya Wildlife Service (KWS).
The cable be laid a further 1.66km from the BMH up to the cable
landing station near Nyali Primary School.
The following are the anticipated impacts and proposed mitigation
measures:
Impact Mitigation Measures
Shipping
interference
• All affected stakeholders will be notified in
advance before commencement of the survey
works follow maritime best practice.
• Observation international and national rules and
regulation of the sea and navigational protocol.
Noise Pollution
• Appropriate scheduling of cable-laying activities
to avoid feeding, spawning areas will reduce
potential noise-related impacts on these species.
• Employ services of a professional marine
observer.
• Applying a digital low-pass filtering algorithm
on the Sea SPY Magnetometer System.
• The equipment should be used when the
dolphins are not visiting the coastal waters of
Mombasa.
Waste
generation
• The waste generated on board will be
segregated, collected and disposed of as per
EMCA on waste regulation of 2006 guidelines.
• Follow waste management plan and ESMP.
• The vessels to be used for submarine cable
laying is required to comply with MARPOL
requirements, which prohibits the disposal to sea
any non-hazardous waste in coastal waters and
in designated “special areas”.
• Appropriate waste holding facilities to be
provided onboard the vessel.
30th July, 2020 THE KENYA GAZETTE
Impact Mitigation Measures
Loss of feeding
habitat
• Clearing will be limited to the minimum needed
for safe implementation of the project BMH.
• Habitat restoration of affected areas upon the
completion of the marine cable installation
phase.
• The equipment must be used when the affected
marine animals are within the radius of
influence.
Acoustic
harassment
• All equipment’s are operating below the acoustic
harassment levels.
Disturbance
• The length of fibre optic meandering in the coral
reefs should be shielded to reduce MR emitted to
the surrounding environment.
• The electric and magnetic field associated with
the fiber-optic are below the threshold that harm
an organism and the cable will be buried.
The full report of the proposed project is available for inspection
during working hours at:
(a) Principal Secretary, Ministry of Environment and Forestry,
NHIF Building, Community, P.O. Box 30126–00100,
Nairobi.
(b) Director-General, NEMA, Popo Road, off Mombasa Road,
P.O. Box 67839–00200, Nairobi.
(c) County Director of Environment, Mombasa County.
A copy of the report can be downloaded at www.nema.go.ke
The National Environment Management Authority invites
members of the public to submit oral or written comments within
thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision
making process regarding this plan.
Comments can also be emailed to dgnema@nema.go.ke
MAMO B. MAMO,
Ag. Director-General,
MR/0783695 National Environment Management Authority.
Dated the 30th July, 2020.
MAMO B. MAMO,
Ag. Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
5413
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- MAMO B. MAMO
- Title
- Ag. Director-General, National Environment Management Authority
- Date Signed
- 30th July 2020
- Page
- 24
- Extraction Method
- regex
Source Gazette
Vol. CXXII No. 147
Published 10th January 2020