GAZETTE NOTICE NO. 12809
GAZETTE NOTICE NO. 12809
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to Regulation 21 of the Environmental Management
and Co-ordination (Impact Assessment and Audit) Regulations, 2003,
the National Environment Management Authority (NEMA) has
received an Environmental Impact Assessment Study Report for the
above proposed project.
The proponent, Shamji Kalyan Pindoria Limited intends to
construct a residential development consisting Phase 3-17 with a total
of 1210 Units. Phase 3 will consist of 90No units (50No.1 bedroom,
34No. 2bedroom, 8No. 2 bedroom), Phase 7 will consist of 90No.
Units (72No. 3 bedroom, 18No. 2 bedroom), Phase 8 will comprise of
20No. Units (16No. 3 bedroom, 4No. 2 bedroom), Phase 9 will
comprise of 90No. Units (50No. 3 bedroom, 32No. 2bedroom, 8No. 1
bedroom) Phase 10 will comprise of 90No. Units (40No. 3 bedroom,
42No. 2 bedroom, 8No. 1 bedroom). Phase 5, 6, 11, 12, 13, 15, and 16
will each comprise of 90No. Units, Phase14 and 17 will consist of
50No. Units and 60No units respectively, School block which will
comprise of a kindergarten and Lower primary school, Playground
shopping Centre, associated facilities and amenities on Plot L.R. No.
24573 off quarry road In Katani Area, Mavoko Sub-county, Machakos
County
The following are the anticipated impacts and proposed mitigation
measures:
Impact Mitigation
Air, noise
pollution and
vibration
• Water sprinkling on driveways.
• Switch off engines not in use.
• Construction work to be confined to between 7
a.m. to 6 p.m.
• Provide and enforce use of PPEs.
4172 4172
Impact Mitigation
• Proper servicing of machinery and equipment.
• Monitor noise levels as per NEMA guidelines.
Health and safety
(risks of
accidents and
injuries to
workers
• Education and awareness to all workers.
• Procure services of a health and safety officer.
• Provide First Aid Kits on site.
• Proper signage and warning to public.
• The contractor to abide by all conditions
including health safety and workforce welfare.
• Personnel to stick to standard operation
procedures.
• Personnel to wear complete protection gear.
• Provision of fire-fighting equipment.
• Comply with Kenyan safety policy and safe
working procedures, laws and regulation.
Solid waste
generation
• Ensure waste materials are disposed off to
County and NEMA approved sites.
• Use of the 3rs – Reduce, Re-use, Re-cycle.
• Solid waste to be put in designated areas for
appropriate disposal.
• Waste segregation at source, Engage a
licensed, competent and effective waste
handler.
Increased water
demand
• Drilling on-site borehole.
• Obtain relevant approvals from Water
Resource Authority.
• Abstract as indicated in the Water Resource
Authority permit.
• Installation of toilet flushes with low volume
cisterns.
• Harvesting of rain water.
Liquid waste
generation and
management
• Availability of waste water treatment plant.
• Proper connection to the treatment plant.
• Regular inspection and maintenance of the
waste disposal systems.
• Use of separate storm water drainage channel.
Increased loading
on Infrastructure
- Increased
traffic -
Increased
demand on
water and
sanitation
service
• Adequate parking within the facility.
• Have paved driveways.
• Encourage rainwater harvesting and water
storage tanks.
• Provide adequate storm water management.
Insecurity • Secure the premise with a perimeter wall and
an electric fence.
• Installation of CCTV cameras at strategic
points.
• Have a entry point that is manned 24 hours.
• Construction of gate house.
The full report of the proposed project is available for inspection
during working hours at:
(a) Principal Secretary, Ministry of Environment, Climate
Change and Foresty, NHIF Building, 12th Floor, Ragati
Road, Upper Hill, Upper Hill, P.O. Box 30126–00200,
Nairobi.
(b) Director General, NEMA, Popo Road, off Mombasa Road,
P.O. Box 67839–00200, Nairobi.
(c) County Director of Environment, Machakos County.
A copy of the EIA report can be downloaded at www.nema.go.ke
The National Environmental Management Authority, invites
members of the public to submit oral or written comments within
thirty (30) days from the date of publication of this notice to the
Director General, NEMA to assist the Authority in the decision
making process for this project.
Comments can also be e-mailed to dgnema@nema.go.ke
MAMO B, MAMO,
Director-General,
MR/5095192 National Environment Management Authority.
Dated the 22nd September, 2023.
MAMO B,
MAMO,.
Extracted Entities (1)
previous_gazette_ref
12809
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- MAMO B
- Title
- MAMO,
- Date Signed
- 22nd September 2023