GAZETTE NOTICE NO. 78
GAZETTE NOTICE NO. 78
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(Cap. 387)
TRANSFER
PURSUANT to section 59 of the Environmental Management and
Coordination Act, Cap. 387, the National Environment Management
Authority (NEMA) has received an Environmental Impact Assessment
Study Report for the above proposed project.
The proponent, JNC Brothers and Company Limited, proposes to
construct a 20 storey (3 No. basements, ground plus 20 floors) multi
dwelling residential complex comprising a total of 476 apartment
units, 266 parking spaces, 2 shop spaces on the ground floor,
recreational spaces and other associated facilities and amenities on plot
L.r. no. 4275/123 located along Riverside Drive, Westlands Sub-
County, Nairobi County.
The following are the anticipated impacts and proposed mitigation
measures:
Possible Impacts Mitigation Measures
Dust emissions from
excavation and
material transport
• Water sprinkling on work areas and
access roads to prevent fugitive dust
violation.
• Covering trucks transporting soil, sand
and other loose materials to and from
site.
• Stockpiles of earth should be sprayed
with water or covered during dry
seasons.
• Provision of dust masks for the
personnel in dust generation areas.
Noise Pollution from
machinery and trucks
• Use of well-maintained equipment.
• Workers in the vicinity of high-level
noise to wear safety and protective
gear.
• Restrict works to daytime hours.
• Avoid unnecessary hooting.
• Ensure regular and prompt
maintenance of the machinery.
• Use of noise suppressors or noise
shields on noisy machinery.
Solid waste generation
(construction debris) • Segregation of waste during the project
cycle.
• Reuse of excavated material, disposal
through licensed handlers.
• Build construction workers’ capacity
on sanitation and hygiene practices.
Soil erosion and runoff • Silt traps,
• Terracing.
• Controlled excavations.
• Proper installation of drainage
structures.
• Proper management of excavation
activities.
Occupational health and
safety
• PPE use by all workers and visitors.
• Safety signage and toolbox talks.
• Use of efficient and well maintained
machines to lift and transfer materials.
Possible Impacts Mitigation Measures
• Provision of equipped first aid kits to
help address emergencies.
• Sensitization on health and safety risks
and their prevention.
Traffic congestion • Ferry building materials during off
peak hours.
• Well trained and experienced drivers.
• Employ traffic marshals to control
traffic in and out of the site.
Fire risks • Install fire alarm with smoke sensors.
• Fire extinguishers at the site in case
fire erupts.
• Declare places with flammable
construction materials as ‘’NO
SMOKING ZONES’’ and display
conspicuous notices of the same.
Energy consumption • Energy efficient lighting.
• Solar integration.
Water consumption • Install water efficient fixtures.
• Regular monitoring of water usage.
• Rain water harvesting.
• Encourage water re use/ recycling
during construction and occupational
phases.
• Sensitization on the means and needs
to conserve water through signs eg.
Keep/leave the tap closed.
Wastewater
management
• Connection to sewer line.
• Regular maintenance of the sewer
system.
Security and safety • CCTV camera installation and security
lights.
• Firefighting equipment, access control
• Safety drills.
• Provision of security guards.
• Adhere to work timings in line with
the NEMA licensing conditions.
The full report of the proposed project is available for inspection
during working hours at:
(a) Principal Secretary, Ministry of Environment, Climate
Change and Foresty, NHIF Building, 12th Floor, Ragati
Road, Upper Hill, Upper Hill, P.O. Box 67839–00200,
Nairobi.
(b) Director-General, NEMA, Popo Road, off Mombasa Road,
P.O. Box 67839–00200, Nairobi.
(c) County Director of Environment, Nairobi City County.
A copy of the EIA report can be downloaded at www.nema.go.ke
The National Environmental Management Authority, invites
members of the public to submit oral or written comments within
thirty (30) days from the date of publication of this notice to the
Director-General, NEMA to assist the Authority in the decision
making process for this project. Kindly quote ref. No.
NEMA/ENVIS/SR/00224.
Comments can also be e-mailed to dgnema@nema.go.ke
MAMO B. MAMO,
Director-General,
MR/7893308 National Environment and Management Authority.
36 36
Dated the 2nd January, 2026.
MAMO B. MAMO,
Director-General, National Environment and Management Authority.
Extracted Entities (1)
previous_gazette_ref
78
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- Cap. 387
- Section
- section 59
- Signed By
- MAMO B. MAMO
- Title
- Director-General, National Environment and Management Authority
- Date Signed
- 2nd January 2026