GAZETTE NOTICE NO. 12831
PURSUANT to clause 5 of Part III of the Schedule of Tariffs 2018, notice is given that all prices for electrical energy specified in Part II of
the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 2.07 Kenya cents per kWh for all meter readings
to be taken in December, 2018.
THE KENYA GAZETTE 14th December, 2018
4362 4362
Information used to calculate the WRMA levy:
Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW = 5 Kenya cents per KWh.
Units Purchased in November, 2018
Hydropower Plant (KWh.)
Gitaru 85,901,000
Kamburu 38,391,000
Kiambere 84,720,000
Kindaruma 19,015,730
Masinga 15,367,000
Tana 10,632,642
Wanjii 2,344,523
Sagana 802,325
Ndula 0
Turkwel 54,536,810
Gogo 892,822
Sondu Miriu 17,809,000
Sangoro 5,512,960
Regen-Terem 2,084,949
Chania 14,430
Gura 1,633,171
Total units purchased from hydropower plants with capacity equal to or above 1MW, 339,658,362 kWh
Total units generated and purchased including hydros excluding exports in November, 2018 = 962,482,438 kWh
ROBERT PAVEL OIMEKE,
MR/4167093 Director-General.
Extracted Entities (1)
previous_gazette_ref
12831
Details
- Signed By
- ROBERT PAVEL OIMEKE
- Title
- Director-General
- Date Signed
- 14th December 2018
- Page
- 11
- Extraction Method
- regex
Source Gazette
Vol. CXX No. 152
Published 16th March 2018