GAZETTE NOTICE NO. 14149
GAZETTE NOTICE NO. 14149
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of the Environmental Management
and Co-ordination (Impact Assessment and Audit) Regulations, 2003,
the National Environment Management Authority (NEMA) has
received an Environmental Impact Assessment Study Report for the
above proposed project.
The proponent, Moses Mutethia Gerald T/A /vloreflow Enterprises
is proposing to establish and operate an asbestos disposal site on a
section of land situated on plot Nos. 1678 and 1679 (Original No.
1108) at Gandini in Kwale County for the activity. The following are
the anticipated impacts and proposed mitigation measures.
The following are the anticipated impacts. and proposed mitigation
measures:
Possible Impacts Mitigation Measures
Impact of sourcing of • Obtain raw materials from sources that are
raw materials from compliant with NEMA Regulations,
environment
• Procure 'vanities that are sufficient for
the intended works only.
• Recycle as fax as practical to stem
wastage.
• Commit to extensive use of recycled raw
materials as will be appropriate and in a
manner that does not compromise the
safety of the development.
Possible Impacts Mitigation Measures
• Provide appropriate PPE to
workforce/occupiers/visitors and enforce
their use.
• Use wire fencing for the entire site.
• Engage security personnel to restrict
access.
• Install warning notices stating "Asbestos
hazard area, keep out". The signs, with
lettering of minimum 150mm in height,
shall be placed so that they are clearly
visible.
• All transportation vessels, re-useable
containers or any other similar article
which have been in contact with asbestos
waste shall be cleaned at the disposal site.
Soil and water
• Construct water proof pits with 130mm
contamination
thick concrete lining/wall and a base of
similar thickness.
• Wrap asbestos waste with a 500 gauge
double wrapped plastic sheet with every
seam sealed with a tape and covered
before disposal.
• Burry asbestos waste at least one meter
below the ground level.
• Dig disposal pit at least one meter above
the water table.
Possible Impacts Mitigation Measures
vehicle engines.
The full report of the proposed project is available for inspection
during working hours at:
(a) Principal Secretary, Ministry of Environment and Forestry,
NHIF Building, 12th Floor, Ragati Road, Upper Hill, P.O.
Box 30126-00100, Nairobi.
(b) Director-General, NEMA, Popo Road, off Mombasa Road,
P.O. Box 67839-00200, Nairobi.
(c) County Director of Environment, Kwale County.
A copy of the report can be downloaded at www.nema.go.ke
The National Environment Management Authority invites
members of the public to submit oral or written comments within
thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision
making process regarding this project.
Comments can also be emailed to dgnema@nema.go.ke
MAMO B. MAMO,
Director-General,
MR/3253174 National Environment Management Authority.
Dated the 24th December, 2021.
MAMO B. MAMO,
Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
14149
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- MAMO B. MAMO
- Title
- Director-General, National Environment Management Authority
- Date Signed
- 24th December 2021