GAZETTE NOTICE NO. 6965
GAZETTE NOTICE NO. 6965
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
RESTORATION
PURSUANT to regulation 21 of the Environmental Management
and Co-ordination (Impact Assessment and Audit) Regulations, 2003,
the National Environment Management Authority (NEMA) has
received an Environmental Impact Assessment Study Report for the
above proposed project.
The proponent, Fair valley Heights Limited proposes to establish
Phase II Fair Valley Heights Residential Development comprising 6
blocks, containing 128 three bedroom units, 178 two bedroom units
and 21 one bedroom units, 10 shops and 19 villas, a commercial zone
with adequate shops, ample parking, a playground and other social
amenities on plot L.R. No. 10426/61 in Mavoko Sub-county, Gimu
Area, Machakos County.
The following are the anticipated impacts and proposed mitigation
measures:
Possible Impacts Mitigation Measures
Liquid waste disposal • Provide portable sanitary facilities for
during construction personnel onsite.
Soil excavation leading to • Excavate only areas to be affected by
site disturbance
buildings.
Dumping of excess excavated
materials to sites designated by NEMA
and county government.
Restoration of sites excavated via
landscaping.
Transmission of covid-19 • Social distancing where applicable.
• Use of masks.
• Screening of workers on daily basis.
Soil erosion • Create and maintain soil traps and
embankments.
• Landscaping after completion of
construction.
Encroachment of riparian • pegging by WRA to clearly demarcate
land riparian land.
Possible Impacts
Mitigation Measures
• fence off the riparian land.
Noise pollution and • Ensure use of serviced and greased
vibration which may equipment.
affect workers onsite,
neighbors and buildings
Switch off engines not in use.
in the neighborhood
Ensure use of earmuffs by machine
operators.
•
Use light machinery most during
excavation to reduce vibration.
Encourage human labour.
• Sensitize drivers to avoid running
vehicle engines and hooting
unnecessarily.
Air quality
• Water sprinkling of driveways to
reduce dust emission during
construction.
• Use of trap nets to reduce dust.
•
Ensure servicing of vehicles regularly.
Risks of accidents and • Education and awareness to all
injuries to workers construction workers.
• Ensure use of appropriate personal
protective clothing.
• Provide First Aid kits on site.
• Ensuring building strength and
stability.
• Proper supervision.
Solid waste generation • Ensure waste materials are disposed of
during construction on county and NEMA approved sites.
• Ensure re-use of materials that can be
re-used.
• Reuse the generated overburden in
backfilling.
• Procure and provide adequate solid
waste collection bins with a capacity
for segregation.
Energy consumption
• Use of standby generators.
• Encourage energy saving appliances.
• Undertake energy audits.
• Harness solar energy.
Excessive water use
• Avoid leakages and running water
while not in use.
• Sensitize the staff and tenants on the
need to conserve the available water.
• Monitor the amount of water being
abstracted from the borehole and any
other source.
• Use water meter as a control measure.
Storm water impacts
• Provide roof gutters to collect and
direct roof water to drains and water
harvesting tanks.
• Develop a storm water drainage
system and linkage to natural drains.
The full report of the proposed project is available for inspection
during working hours at:
(a) Principal Secretary, Ministry of Environment and Forestry,
NH1F Building, Community, P.O. Box 30126-00100,
Nairobi.
(b) Director-General, NEMA, Popo Road, off Mombasa Road,
P.O. Box 67839-00200, Nairobi.
(c) County Director of Environment, Machakos County.
A copy of the report can be downloaded at www.nema.go.ke
The National Environment Management Authority invites
members of the public to submit oral or written comments within
thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision
making process regarding this project.
Comments can also be emailed to dgnema@nema.go.ke
MAMO B. MAMO,
Director-General,
MR/I791560 National Environment Management Authority.
Dated the 9th July, 2021.
MAMO B. MAMO,
Director-General,.
Extracted Entities (1)
previous_gazette_ref
6965
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- MAMO B. MAMO
- Title
- Director-General,
- Date Signed
- 9th July 2021
- Page
- 51
- Extraction Method