GAZETTE NOTICE NO. 1242
GAZETTE NOTICE NO. 1242
THE PHYSICAL AND LAND USE PLANNING ACT
(No. 13 of 2019)
COMPLETION OF DEVELOPMENT PLAN
NOTICE is given that preparation of the above—mentioned development plan was on 26th November, 2019, completed.
The development plan relates to land situate in Kapkilel Trading
Centre, Nandi County.
Copies of the development plan as prepared have been deposited for public inspection at the office of the County Executive Committee
Member in charge of Physical and. Land Use Planning and County
Physical Planner, Kapsabet.
The copies so deposited are available for inspection free of charge by all persons interested at the office of the County Executive
Committee Member in charge of Physical and Land Use Planning and
County Physical Planner, Kapsabet, between the hours of 0800hrs and
1700hrs.
Any interested person/s who wishes to make any representation in connection with or objection to the above development plan may send such representations or objections in writing to be received by the
County Physical Planner, P.O. Box 802-30300, Kapsabet, within thirty (30) days from the date of publication of this notice and such representation or objection shall state the grounds on which it is made.
PHILEMON BURETI, MR/1702683 CECM, Physical and Land Use Planning.
Mitigation Measures necessary to reduce dust generation by vehicles and other machinery movement.
Appropriate PPE to be provided to all workers likely to be affected by the dust.
• Provide cut off trenches/storm water drains channeling the water into nearby storm water drains.
• Notify workers about the upcoming activity.
• Train staff of safe working procedures.
• Provide appropriate PPE complying with international good practice.
• Post appropriate signage onsite to inform/wam employees and the public.
• Develop an asbestos removal management plan that shall identify specific control measures that will be put in place to ensure workers and other persons not, involved in the removal work are not at risk when asbestos removal work is being undertaken.
• Provide appropriate and adequate PPE.
• Setting up an area for personal decontamination.
• Ensuring that decontamination of the work area, workers, PPE and tools used in asbestos removal work to eliminate and or minimize exposure to airborne asbestos fibers.
Possible Impacts
Soil erosion and water logging
Health and safety aspects
Traffic and pedestrian safety
Air pollution from dust and/or asbestos dust, exhaust fumes, etc.
Dated the 26th November, 2021.
Extracted Entities (1)
previous_gazette_ref
1242
Details
- Act / Legislation
- THE PHYSICAL AND LAND USE PLANNING ACT
- Reference
- No. 13 of 2019
- Date Signed
- 26th November 2021
- Page
- 46
- Extraction Method
- regex
Source Gazette
Vol. CXXIII No. 30
Published 3rd January 2021